As part of the development of Rue David Bowie, construction materials, comprising approximately 200 concrete blocks, will be transported and stored in the designated area on Rue Jean-Baptiste Berlier. This operation, scheduled for Saturday, October 3rd, 2026, will occur between 9 AM and 6 PM.
The handling of this equipment will require multiple truck trips and may generate noise disturbances in the area. SEMAPA apologizes for any inconvenience caused by these operations.




