Public consultation for the Paris-Charles de Gaulle development project by 2032

An electronic consultation is open from November 12, 2026, to February 12, 2027, concerning the project for the expansion and densification of Terminal 3 and other developments.

Generic image of a large airport with multiple terminals and runways, under a slightly overcast sky, typical of the Île-de-France region.
AI

Generic image of a large airport with multiple terminals and runways, under a slightly overcast sky, typical of the Île-de-France region.

A public electronic consultation is being organized by Groupe ADP from Thursday, November 12, 2026, to Friday, February 12, 2027, concerning the Paris-Charles de Gaulle development project for the 2032 horizon.

The project involves the densification and expansion of Terminal 3, the extension of hotel areas, the creation of a de-icing area, a connecting train, and an on-line maintenance hangar. It includes the creation of a boarding pier, modification of an existing Terminal 3 building, a technical building for the de-icing area, four stations, the extension of a maintenance and storage site, and an aircraft maintenance hangar.
The consultation file is available in a simplified paper format at the town halls of Mesnil-Amelot, Mitry-Mory, Mauregard, Tremblay-en-France, and Roissy-en-France, during their usual opening hours.
In digital format, the file can be consulted at the town hall of Mesnil-Amelot on a dedicated computer terminal, as well as on the website of the state services for the departments of Seine-et-Marne, Seine-Saint-Denis, and Val d’Oise.
A digital version is also accessible via the website dedicated to the online registry: registre-numerique.fr/amenagement-cdg-horizon-2032.
Based on information from the official source: Mairie de Chauconin-Neufmontiers (03/11/2026)